67! Annual repair of large road maintenance machinery
Published:
2023-02-21
Hot summer, scorching with high temperature
Wuhan Large Road Maintenance Machinery Operation and Maintenance Section
In the maintenance shop of the equipment maintenance workshop
Blowed the battle horn for the annual repair of large aircraft
This annual inspection will take advantage of the summer break
9 workshops for maintenance and overhaul are planned
Totally 67 large road maintenance machines
Carry out annual system maintenance
Each large machine shall complete seven bench processes from cleaning to inspection
On average, 1.11 sets have to be inspected in one day



Develop completion plan
The section plans to complete the delivery and inspection of large locomotives within two months, and carry out inspection, disassembly, flaw detection, repair, assembly, test and other work on 14 system assemblies and components including coupler device, power transmission system, braking system, body structure and working device of each large locomotive. In order to complete the summer annual repair task on schedule, each workshop arranged the construction period backward, formulated a detailed maintenance plan, organized the division of labor according to the principle of "fixed person and fixed project", achieved orderly production organization, steadily improved the completion rate, and effectively promoted the maintenance progress.

High temperature 38 ℃
This summer's overhaul is not only tight in time and heavy in task, but also requires the overhaul personnel to overcome the "baptism" of high temperature and sweat. In recent days, Wuhan has continuously issued a high-temperature orange warning. The temperature has reached above 38 ℃ for a time, and the warehouse is relatively closed. Therefore, "wet" maintenance personnel can be seen everywhere in the workplace.


It is reported that as of July 16
The workshop has completed a total of 18 vehicle maintenance
Currently 26 vehicles under repair
It is estimated that before the middle of August
All screening and overhaul workshops in this section
The annual repair work has been completed
Source: Wuhan Large Road Maintenance Machinery Operation and Maintenance Section
Related news
2021/09/15
Contact information
Telephone
Address: Building 5, Jincheng, Nubinkai International Community, No. 99, Fangcao Road, Hanyang District, Wuhan, Hubei Province
Follow us